The viaducts pillars are nearly finished. V9 (the 9th viaduct) only needs a short section of the table (or trough, the horizontal part), probably to be built with scaffolding. Our V10 is waiting for MSS90 to be assembled, now that it has finished its task at Edige. Two of our pillars can be seen on the right of the photo - south of the double headed 8th pillar.